NINGDE-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Fujian Ningde Nuclear Power Company, Ltd.
Fujian Ningde Nuclear Power Company, Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1018 MWe
1018 MWe
1089 MWe
2905 MWt
Construction Start Date First Criticality Date
18 Feb, 2008
24 Nov, 2012
First Grid Connection Commercial Operation Date
28 Dec, 2012
15 Apr, 2013

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
82.97 TW.h
88.6 %
87.5 %
11.4 %
86.0 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2012 4.120 1018 81
2013 6947.980 1018 7369 99.3 99.9 99.9 96.6 96.6
2014 5047.230 1018 5119 58.4 56.7 75.3 56.6 73.8
2015 7583.950 1018 7798 89.0 88.0 79.9 85.0 77.9
2016 6764.980 1018 7207 82.0 97.3 84.6 75.6 77.3
2017 7210.580 1018 7177 81.9 83.8 84.4 80.9 78.0
2018 8116.450 1018 7756 88.5 88.5 85.1 91.0 80.3
2019 8608.230 1018 8567 97.8 96.5 86.8 96.5 82.7
2020 8119.410 1018 8007 91.2 90.8 87.3 90.8 83.7
2021 8209.230 1018 8070 92.1 92.1 87.9 92.1 84.7
2022 8917.030 1018 8760 100.0 100.0 89.1 100.0 86.3
2023 7443.810 1018 7454 85.1 83.5 88.6 83.5 86.0
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-07-02

Previous  (LUFENG-6) (NINGDE-2)  Next